You are browsing a test environment - orders will not be fulfilled. Questions? betacom@nuernbergmesse.de

Rigging package

Rigging package
Select the right rigging package
Rigging guide

Package Size

Price upon request

Product informationRequired information
  1. Construction total weight
    Please upload a plan of stand showing exact position(s) for mounting suspension points”
  2. Start of construction
    Please enter the height of the anchor point above the hall floor in meters. Please note the maximum construction height determined by the organizer
  3. Cable feed to the construction
    Please enter the individual weight per suspension point (in kg) Dividing the total load by the number of points is generally unrealistic for determining the individual point loads. For statically indeterminate and/or complex systems, please include a structural analysis. Statically determinate system: e.g. a truss section with 100 kg symmetrical total load at 2 suspension points, which are also placed symmetrically. Statically indeterminate system: line loads at more than 2 suspension points and/or surface loads

  4. Please enter the total weight of the construction in kg.
  5. Installation of the structure
    What type of suspension is desired (e.g. flags, banners, lighting, trusses, Maxima or Syma system)?
  6. Height of the anchor point
    When will you start setting up? (date / approx. time)?
  7. Type of suspension
    If you need a cable feed from your main electrical distribution board on the ground floor via the hall roof to your construction, please select which of the two cables is required:
  8. Standskizze Rigging
    To install the structure on the hanging points we use:
  9. Individual weight per hanging point
This information needs to be provided until 8/14/2025.
Recommended products